Why label cables?

Make cable labels command - connectCAD
Make cable labels command – connectCAD

We engineers tend to take it for granted that all wires should be labelled in an installation – but is it actually worth the effort?

Thinking about this one day I decided to try and do the math… Clearly it depends on how many cables we are talking about. But say you have a bunch of 10 cables going from A to B and they haven’t been labelled, what effort does it take to sort them out?

Make cable lables
photo: Eric e-magic

So for our thought-experiment let’s get two technicians one at one end, one at the other. Give them some test gear and a walkie-talkie each. Now they can start testing wires. To find the first wire among 10 could take up to 10 tests, to find the second wire may take up to 9 tests, to find the third wire 8 tests and so on. So the worst case would be:

Worst case = 10 + 9 + 8 … + 3 + 2 + 1 = 55 tests

This is very pessimistic. No-one is that unlucky, right? Let’s, say they are lucky and pick the right wire every time.

Best case = 1 + 1 + 1 … + 1 + 1 + 1 = 10 tests

Nice but quite unlikely. I’m not a statistician, but the most probable outcome is in middle.

Average case = 5.5 + 5 + 4.5 … + 2 + 1.5 + 1 = 32.5 tests

So how long is it going take our techies to sort out this mess? If each test takes them about 30 seconds. What with handling the cables, connecting the tester, communicating and putting labels on, we are being optimistic but let’s go with 30s.

Best case         5             minutes
Average case    16.25     minutes
Worst case        27.5     minutes

If it takes 30s per cable to put labels on before you pull them, then labeling before we pull the cables saves 11 minutes. So what’s the fuss about?

Well once the numbers of cables get a little bigger scary things happen. Look at this.

20 cables need on average 115 tests    – nearly an hour’s work

40 cables need an average of 430 tests – that’s 3 1/2 hours !!!

Forty cables is a small system. Yet without labeling you can lose half a day for nothing. And that’s without fault-finding…

So there it is. It’s not a case of OCD, it really does pay to label your wires.